Chelyabinsk: diagnostics and repair of Elekta linear accelerator

From November 10 to 13, 2025, service engineer Ilya Shchetkin in Chelyabinsk, using the Elekta Synergy linear accelerator, in accordance with the contract, carried out diagnostics and performed repairs, replaced the ionization chamber, mylar mirror, and the lens of the Agility Head infrared camera.