Syktyvkar: repair of two Elekta linear accelerators
From January 12 to 15, 2026, service engineer Pavel Fukalov in Syktyvkar carried out repairs on the Elekta Precise linear accelerator in accordance with the contract, replaced the MLCI2 power supply, and replaced the potentiometer of the gantry positioning system on the Elekta Synergy linear accelerator.