Tolyatti: Maintenance of Elekta linear accelerator 17.11.2024 ‹ › From November 11 to November 14, 2024, service engineer Pavel Fukalov in Tolyatti performed scheduled maintenance (6- and 12-month intervals) on the Elekta Precise linear accelerator.