Penza: repair of two Elekta linear accelerators

From March 11 to 13, 2026 in Penza, service engineers Sergei Chuvakhin and Pavel Fukalov, in accordance with the contract, repaired the Elekta Versa HD linear accelerator, replaced the ODI distance meter, and on the Elekta Infinity linear accelerator, replaced the ODI distance meter and repaired the XVI portal imaging system detector.