Kirov: diagnostics and maintenance of the Elekta linear accelerator
From September 30 to October 4, 2024, service engineers Pavel Fukalov and Konstantin Lundin in Kirov, using an Elekta Synergy linear accelerator, checked the vacuum system for leaks and performed scheduled maintenance (6- and 12-month intervals) in accordance with the manufacturer’s protocol.