Sochi: diagnostics and repair of Elekta linear accelerator

From June 29 to July 1, 2026, service engineer Konstantin Lundin in Sochi, in accordance with the contract on the Elekta Versa HD linear accelerator, carried out diagnostics and performed repairs, transferred the faulty cores to backup ones in the RIC - Gantry power cable, the cable assembly needed to be replaced.