Penza: diagnostics of two Elekta linear accelerators
On June 29 and 30, 2026, service engineer Ilya Shchetkin in Penza, in accordance with the contract on the Elekta Versa HD linear accelerator, carried out diagnostics and revealed a faulty Thyratron Pulser PCB board in the modulator and a faulty Dixel IC208 chiller control controller needed replacement. And on the linear accelerator Elekta Synergy detected a faulty thyratron.