Stavropol: repair of Elekta linear accelerator

From April 7 to April 11, 2025, service engineer Konstantin Lundin in Stavropol, using a Versa HD linear accelerator, replaced the cathode assembly with the filament of the electron gun and the mylar mirror of the Agility Head optical system.