Veliky Novgorod: diagnostics and repair of linear accelerator 09.09.2023 ‹ › From August 30 to September 1, 2023, service engineer Pavel Fukalov diagnosed unstable dose rate and repaired a linear accelerator in Veliky Novgorod.