Astrakhan: diagnostics and calibration of the Elekta linear accelerator

From November 4 to 5, 2025, service engineer Sergei Chuvakhin in Astrakhan, using an Elekta Synergy linear accelerator, carried out diagnostics, cleaned and adjusted the MLCi2 optical system.