Tula: repair of two linear accelerators

From August 21 to 23, 2023, engineers Konstantin Fukalov and Ilya Shchetkin in Tula repaired the infrared camera of the Agility Head optical system, plus replaced the mylar mirror, followed by calibration on Elekta Infinity. And we repaired the vacuum system at Elekta Synergy.