Tula: diagnostics and repair of two Elekta linear accelerators

From June 15 to 18, 2026, service engineers Ilya Shchetkin and Alexander Ivanov in Tula, in accordance with the new contract, carried out diagnostics and repairs of two linear accelerators. The Mylar mirror on the Elekta Synergy linear accelerator was replaced and the Agility Head optical system was calibrated. And on the Elekta Infinity linear accelerator we replaced the power supply for the controller of the internal circuit of the cooling system, the network card in the NRT control computer, and the TCS network splitter.