Kirov: repair and maintenance of Elekta linear accelerator
From February 8 to 11, 2026, service engineer Evgeny Smirnov in Kirov, using an Elekta Infinity linear accelerator, in accordance with the contract, carried out diagnostics and repairs, replaced the HD on the NRT control computer and reinstalled the system. Conducted scheduled maintenance (6-month interval) in accordance with the manufacturer’s protocol.