Syktyvkar: diagnostics and repair of Elekta linear accelerator
From December 17 to 19, 2025, service engineer Pavel Fukalov in Syktyvkar, using an Elekta Synergy linear accelerator, diagnosed the Dose Rate Mon fault, eliminated contact bounce on the electron gun, adjusted the radiation parameters, and calibrated the Agility Head optical system.