Nazran: repair and maintenance of Elekta linear accelerator
From July 21 to July 24, 2025, service engineer Pavel Fukalov in Nazran performed repairs on the Elekta Synergy Platform linear accelerator, replaced the DLG carriage control board and carried out scheduled maintenance (6-month interval) in accordance with the manufacturer’s protocol.